Solar panel installation decides how a plant performs for the next twenty-five years. Indrasan Solar installs rooftop solar across Ahmedabad with engineered structures, correctly sized cabling, proper earthing and stage-wise quality checks — typically completed in two to four working days for a standard home.

Typical install time

2–4 working days

Roof area needed

~80–100 sq ft / kW

Generation in Gujarat

~1,400 units / kW / year

Projects delivered

4500+

Book a Free Site Survey

Share a few details and our team will get back to you with an assessment based on your actual bill and roof.

We use your details only to respond to this enquiry.

Our installation process, step by step

Each stage has a defined output, so you always know where the project stands.

  • Site survey — roof structure, shadow study, meter and load check
  • Design — capacity, layout, single-line diagram, generation estimate
  • Material delivery — modules, inverter, structure, cables, protection
  • Structure erection — anchored and levelled for wind loads
  • Module mounting and DC wiring with weather-sealed routing
  • AC side, earthing, surge protection and inverter configuration
  • Testing, commissioning, net meter and monitoring handover
Our installation process, step by step

Structure and mounting built for Ahmedabad terraces

Ahmedabad rooftops range from flat RCC terraces to industrial sheds and shaded urban plots. We use hot-dip galvanised or high-grade coated structures, elevated designs where the terrace still needs to be usable, and layouts that keep walkways and water tanks accessible. Fasteners are torqued to specification and the array is set at a tilt that suits the local latitude.

Structure and mounting built for Ahmedabad terraces

Electrical work that passes inspection first time

Cable sizing based on actual runs, DC and AC isolation, surge protection devices, dedicated earthing pits for array, inverter and lightning arrestor, and a properly configured inverter with grid parameters set per DISCOM norms. Clean electrical work is also what makes the net meter inspection straightforward.

Electrical work that passes inspection first time

Subsidy and net metering after installation

For eligible residential consumers, the PM Surya Ghar subsidy of up to ₹78,000 is credited after installation, inspection and net meter commissioning. We file the application, arrange the inspection and follow up until the bidirectional meter is installed and the plant is officially exporting.

Subsidy and net metering after installation

What happens after commissioning

You receive the commissioning report, warranty documents and monitoring access. We then track generation, advise on cleaning frequency for Ahmedabad's dust conditions, attend faults and coordinate warranty claims. Annual maintenance contracts are available for homes, societies and industrial plants.

What happens after commissioning

Our solar work in Ahmedabad

A look at the kind of rooftop and ground-mounted plants we design, install and maintain across Gujarat.

Structure erection on a flat terrace
Structure erection on a flat terrace
Module mounting and DC routing
Module mounting and DC routing
Inverter and AC distribution installation
Inverter and AC distribution installation
Completed residential installation
Completed residential installation
Rooftop array, Ahmedabad
Rooftop array, Ahmedabad
Industrial shed installation
Industrial shed installation

Frequently asked questions

Indrasan Solar — A World With Energy Independence

Ready to plan your solar system?

Talk to our team about your consumption, your roof and your goals. No obligation — just a clear assessment of what makes sense for you.